Bond 2023 Information

Proposed May 2023 Bond Program:

  • $19,900,000 covering basic “priority needs” at all District buildings

  • A 0.90 mill tax increase is required to generate the bond funding ($90 increase per year for $200,000 home)

May 2023 Bond Program Projects – Big Picture Work Categories

  • Parking Lots, Drives, and Sidewalk Upgrades

  • Roof Replacement (at Hollywood Elementary and the Middle School)

  • Windows, Doors, and Metal Siding Upgrades

  • ADA and Code Compliance Upgrades

  • Heating Cooling and Ventilation Upgrades

  • Electrical and Fire Alarm Upgrades

  • Classroom Furnishing & Equipment Upgrades

  • Instructional Technology Upgrades

Specific Bond Work Scope List

How the Work Scope was Determined/Decided

In the Fall of 2022, Lakeshore Public Schools conducted a community survey asking for feedback regarding facility improvements in the district. 1390 responded to the survey (Thank You!).  Here are the survey results: